Article 4
(Type and Scope of Professional Engineer Certification)
The scope of soil and water conservation treatment and maintenance designated by the central level responsible authority pursuant to Article 6 of the Act, or above, is as follows:
1. Treatment, operation or utilization under Subparagraphs 1, 6 to 8, Paragraph 1, Article 8 of the Act: the cost of soil and water conservation treatment and maintenance totals NT 20 million dollars or above.
2. The utilization behavior matches the Paragraph 1, Article 12 of the Act (requiring a soil and water conservation plan), but does not include that of the Paragraph 4, Article 12 (requiring a simplified soil and water conservation statement).
3. Treatment, operation or utilization under Subparagraphs 9, Paragraph 1, Article 8 of the Act: the area of excavation and soil preparation is at least 2,000m2, or the total area being excavated and filled is at least 5,000m3.
The special municipality or county/city regulatory authority may, subject to the special features or requirements of the environment of the relevant area under its control, draft stricter conditions than those described in the preceding paragraph, submit the draft to the central regulatory authority for approval, and enforce the approved conditions upon such approval.
|