Article 7
The inspection on the dangerous machines or equipment as stipulated in Paragraph 1 of Article 16 in these Regulations shall be carried out by Labor Inspection Agency or Inspection Agency which are designated by the central competent authority (hereinafter referred to as the inspecting organization) .
The necessary qualification certificate of inspection mentioned in the previous subparagraph ,that issued by the inspecting organization.

Article 13
The contents of the completion inspection of the r fixed type cranes include the items as shown below:
1. Structure and performance inspection: including review of the strength calculation for structure, selection of dimensions and materials, review of lifting load, installation and performance of safety devices, inspection of electrical and mechanical parts, methods of construction, as-required identification of rated load and lifting load etc., operating speed of various devices under no load and rated load conditions and other inspection items as required.
2. Load test: The load test refers to a test that is performed for purpose of verifying the as-required hoist, traveling, and rotating actions of the crane as well as the traveling action of the trolley by placing a load weighing 1.25 times of the rated load of the crane ( or 50 tons plus the rated load of the crane whenever the rated load exceeds 200 ton) on the load-lifting attachment of the crane during the test.
3. Stability test: The stability test refers to a test that is performed by placing a test load weighing 1.27 times of the rated load of the crane, on the hoisting equipment under the most adverse conditions with respect to stability, and also without use of the runaway prevention devices and rail clip devices.
4. Other as-required inspections.
Those fixed type cranes of overhead or bridge type, that are free from being overturned, may be exempted from the test requirements stipulated under the preceding Item 3 of this Paragraph.
Those imported cranes evidenced by substantial inspection certificates, may be granted a full or partial exemption from the inspection requirements as stipulated under the preceding Paragraph 1 by the Inspecting Organization.
Those cranes which hold a valid qualification certificate through previous completion inspection and are to be relocated following the sequence of construction activities, may be granted a full or partial exemption from the inspection requirements as stipulated under the preceding Paragraph 1 by the Inspection Organization, as long as the cranes’ own structure and trolleys remain in an intact condition, namely without being dismantled and reassembled.

Article 16
The inspecting organization shall stamp the qualification mark (annex 7) on the specification of Fixed TypeCranes for the fixed type cranes qualified through the completion test orthey are deemed qualified according to pParagraph 3 and 4 of Article 13, after being signed by the labor inspector or acting inspector (hereinafter referred to as the Inspector), 1 copy of the specification shall then be delivered to the applicant, and the qualification mark shall be printed, painted or posted at distinct part of the object inspected for identification.
The inspecting organization shall issue the Report for Results of Completion Inspection (Annex 8) and Qualification Certificate (Annex 9) to the fixed type cranes qualified in the completion inspection, the maximum period of validity for the aforesaid documents shall be 2 years.
The Employer shall hang the aforesaid Qualification Certificate or its photocopy in the cab of the cranes or obvious locations in the workplace.

Article 93
When applying for the alteration inspection of boilers, the Manufacturer shall fill the Application for Alteration Inspection of boilers (Annex 43) and submit it the documents as shown below.
1. Qualification certificate of the type inspection of the manufacturing equipment.
2. 2 copies of specification of the boiler
3. Drawings of the altered parts.
4. Detailed structure drawing and strength calculation sheet, each 2 copies. However, this may be ignored if the inspecting organization deems it unnecessary.
5. Aforesaid certificates for qualification of inspections or their photocopies.
Stipulations of Paragraph 3 of Article 73 and Article 79 shall apply to the alteration inspection.